Amar Infra

Work in Hand

Sr. Name of Project Name of the employe Value of contract (Rs. in Cr.)
1 Development of Six Lane Dhanara (Odisha/Chhattisgarh Border) – Hatibena Section of NH-130-CD Road from km 124+611 to km 146+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package–OD-1) NKC Projects Pvt. Ltd., New Delhi 370.30
2 Development of Six Lane Basanwahi - Marangpuri Section of NH-130-CD Road from Km. 99+500 to Km. 124+661 under Raipur-Visakapatnam Economic Corridor in the State of Chhattisgarh on Hybrid Annuity Mode. Package-CG-03. KMV Projects Ltd. 479.54
3 Upgradation of existing 4lane Ismailabad-Ambala section of NH152(Km0.000 to Km42.500) (Part of Ambala-Kotputli Corridor) to 4lane access controlled stretch by providing grade separated structures and service roads under BMP-I in Haryana on EPC Mode. NHAI, New Delhi 283.67
4 Rehabilitation and Upgradation of Hoshiarpur to Una up to PB/HP border section of NH-503A to 2 lane paved shoulder configuration (from Design Chainage Km. 15+200 to Design Chainage Km. 30+348) & Construction of 4 lane Hoshiarpur Bypass (from Design Chainage Km. 2+425 to Design Chainage Km. 15+200) Total Length : 27.923 Kms) in the State of Punjab (Package-IV) under NH (O) on EPC Mode Project NHAI, New Delhi 243.13
5 Widening & Strengthening of section from Bharthana Chowk to Kodarkoot (Km. 0.00 to Km. 40.00) of NH-91A in the state of Uttar Pradesh on EPC Mode. C.E., N.H. Zone, Lucknow 134.85
6 Package No. 1, Rehabilitation & Upgrading of Tikrapara -Sejbahar - Semara -Bhakhara - Dhamtari (Old Dhamtari) Road Length - 54.682 Km. ADB Project, CSRSP, PWD, Raipur (C.G.) 210.85
7 Package No. 14, Rehabilitation & Upgrading of Karhibhadar Nipani Mokha Batler Jamgaon Road, Length 35.52 Km. ADB Project, CSRSP, PWD, Raipur (C.G.) 114.98
8 Renewal & Maintenance of Rural Road under the PMGSY of C.G. State, Gunderdehi, Distric - Balod, PKG No. CG-21-M-15 Year 2022-23. CGRRDA, Balod (C.G.) 3.83
9 Construction of Thakurtola to Lavatara Road Length 9.00 K.M (Actual Length 9.20 km) i/c Bridge and Culverts DISTT.- Rajnandgaon (C.G.) (Under NABARD Scheme) E.E. PWD, Khairagarh (C.G.) 18.47
10 Construction of Gadadih Kanakot Road Length 2.20 K.M. including Bridges & culverts At Distt.- Durg (C.G.) E.E. PWD, Durg (C.G.) 4.69
11 Construction of Chhata To Achanakpur Road Length 3.30 K.M. Including Bridges & culverts At Distt.- Durg (C.G.) E.E. PWD, Durg (C.G.) 7.53