1 |
Development of Six Lane Dhanara (Odisha/Chhattisgarh Border) – Hatibena Section of NH-130-CD Road from km 124+611 to km 146+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package–OD-1) |
NKC Projects Pvt. Ltd., New Delhi |
370.30 |
|
2 |
Development of Six Lane Basanwahi - Marangpuri Section of NH-130-CD Road from Km. 99+500 to Km. 124+661 under Raipur-Visakapatnam Economic Corridor in the State of Chhattisgarh on Hybrid Annuity Mode.
Package-CG-03. |
KMV Projects Ltd. |
340.52 |
|
3 |
Upgradation of existing 4lane Ismailabad-Ambala section of NH152(Km0.000 to Km42.500) (Part of Ambala-Kotputli Corridor) to 4lane access controlled stretch by providing grade separated structures and service roads under BMP-I in Haryana on EPC Mode. |
NHAI, New Delhi |
283.67 |
|
4 |
Rehabilitation and Upgradation of Hoshiarpur to Una up to PB/HP border section of NH-503A to 2 lane paved shoulder configuration (from Design Chainage Km. 15+200 to Design Chainage Km. 30+348) & Construction of 4 lane Hoshiarpur Bypass (from Design Chainage Km. 2+425 to Design Chainage Km. 15+200) Total Length : 27.923 Kms) in the State of Punjab (Package-IV) under NH (O) on EPC Mode Project |
NHAI, New Delhi |
243.13 |
|
5 |
Widening & Strengthening of section from Bharthana Chowk to Kodarkoot (Km. 0.00 to Km. 40.00) of NH-91A in the state of Uttar Pradesh on EPC Mode. |
C.E., N.H. Zone, Lucknow |
134.85 |
|
6 |
Construction of High Level Bridge I/c. Approaches Across Sheonath River On Ruda-Dhiri Road in Km. 1.4. |
Bridge Const. Division Rajnandgaon (C.G.) |
10.50 |
|
7 |
Construction of High Level Bridge Across Sheonath River On Rawelidih -Arasnara-Doma-Patharia Road. |
Bridge Const. Division Rajnandgaon (C.G.) |
9.90 |
|
8 |
Up-gradation to two lane /four lane with paved shoulder configuration of Gotajamhari to Akabeda in Km 58.100 to 65.600 = 7.50 Km. of NH-130D (PART-2) |
S.E., PWD, N.H. Circle,
Raipur (CG) |
44.78 |
|
9 |
Four Laning of Durg Bypass from km 308+600 to km 326+600 on NH-6 (New NH – 53) Chhattisgarh (Project Length = 18 km) “Rectification of existing Surface and Renewal Course with 25mm Thick Bituminous Concrete (BC) on the Entire Length and Width of Durg Bypass(18 km) km and Service roads” |
TRIL Urban Transport Private Limited, Mumbai |
15.99 |
|
10 |
Construction of VUPs and service road at location (I) Somni from Ch. 330+000 to Ch. 330+500, (II) Sundara Village from Ch. 336+500 to Ch. 337+000, (III) Pendri Village from Ch. 346+500 to Ch. 347+000, (IV) Maharajpur Village from Ch. 377+300 to Ch. 377+800, (V) Chichola (Y-Junction Point) from Ch. 379+400 to Ch. 379+900 on End of Durg Bypass to CG/MH Border Section of (Old NH-06) New NH-53 Under Road Safety Improvement in The State of Chhattisgarh on EPC Mode. |
Regional Officer NHAI, RO-Raipur (C.G.) |
68.40 |