1 |
Development of Six Lane Dhanara (Odisha/Chhattisgarh Border) – Hatibena Section of NH-130-CD Road from km 124+611 to km 146+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package–OD-1) |
NKC Projects Pvt. Ltd., New Delhi |
370.30 |
2 |
Development of Six Lane Basanwahi - Marangpuri Section of NH-130-CD Road from Km. 99+500 to Km. 124+661 under Raipur-Visakapatnam Economic Corridor in the State of Chhattisgarh on Hybrid Annuity Mode.
Package-CG-03. |
KMV Projects Ltd. |
479.54 |
3 |
Upgradation of existing 4lane Ismailabad-Ambala section of NH152(Km0.000 to Km42.500) (Part of Ambala-Kotputli Corridor) to 4lane access controlled stretch by providing grade separated structures and service roads under BMP-I in Haryana on EPC Mode. |
NHAI, New Delhi |
283.67 |
4 |
Rehabilitation and Upgradation of Hoshiarpur to Una up to PB/HP border section of NH-503A to 2 lane paved shoulder configuration (from Design Chainage Km. 15+200 to Design Chainage Km. 30+348) & Construction of 4 lane Hoshiarpur Bypass (from Design Chainage Km. 2+425 to Design Chainage Km. 15+200) Total Length : 27.923 Kms) in the State of Punjab (Package-IV) under NH (O) on EPC Mode Project |
NHAI, New Delhi |
243.13 |
5 |
Widening & Strengthening of section from Bharthana Chowk to Kodarkoot (Km. 0.00 to Km. 40.00) of NH-91A in the state of Uttar Pradesh on EPC Mode. |
C.E., N.H. Zone, Lucknow |
134.85 |
6 |
Package No. 1, Rehabilitation & Upgrading of Tikrapara -Sejbahar - Semara -Bhakhara - Dhamtari (Old Dhamtari) Road Length - 54.682 Km. |
ADB Project, CSRSP, PWD, Raipur (C.G.) |
210.85 |
7 |
Package No. 14, Rehabilitation & Upgrading of Karhibhadar Nipani Mokha Batler Jamgaon Road, Length 35.52 Km. |
ADB Project, CSRSP, PWD, Raipur (C.G.) |
114.98 |
8 |
Renewal & Maintenance of Rural Road under the PMGSY of C.G. State, Gunderdehi, Distric - Balod, PKG No. CG-21-M-15 Year 2022-23. |
CGRRDA,
Balod (C.G.) |
3.83 |
9 |
Construction of Thakurtola to Lavatara Road Length 9.00 K.M (Actual Length 9.20 km) i/c Bridge and Culverts DISTT.- Rajnandgaon (C.G.) (Under NABARD Scheme) |
E.E. PWD, Khairagarh (C.G.) |
18.47 |
10 |
Construction of Gadadih Kanakot Road Length 2.20 K.M. including Bridges & culverts At Distt.- Durg (C.G.) |
E.E. PWD, Durg (C.G.) |
4.69 |
11 |
Construction of Chhata To Achanakpur Road Length 3.30 K.M. Including Bridges & culverts At Distt.- Durg (C.G.) |
E.E. PWD, Durg (C.G.) |
7.53 |